Projects
Pfizer R and D Facility
New World Tower
New World Tower used Gridworx ULF system with Domoos Dekton (UCS). Located at the meeting point of Miami’s dynamic downtown and the open waters of Biscayne Bay, 100 Biscayne is where worlds collide. Spurred by the city’s exploding tech scene and thriving art and design culture, 100 Biscayne is architecturally reimagined to embody a place where business meets lifestyle.
Local 537 Pipefitters
Local 537 Pipefitters used Gridworx SKR system with Gray Mist (Honed) Limestone.. The new headquarters and training facility for the Pipefitters Association Local Union 537 is a four-story, 70,000-square-foot building and features a pipefitting training facility, office space, educational classrooms, and assembly space with capacity for up to 500 people. 117 parking spaces are built on site.
Denver Art Museum Offices
The Denver Art Museum’s new, privately funded administration building is complete with Dover Light Fleuri Honed Limestone. The 50,000-square-foot building, designed to house more than 100 museum employees, including administrative staff, curators and educators, is located immediately west of the museum’s Frederic C. Hamilton Building and directly south of the Clyfford Still Museum on the site of a former staff parking lot.
Asheville Art Museum
Hollywood Casino Kansas
Marriott Seattle
This contemporary hotel is in the rapidly developing Bellevue downtown. The hotel is located less than a mile from interstate 405 and a short walk to the Bellevue botanical garden.
Rivers Casino and Resort
Smith Performing Arts Center
Smith Performing Arts Center with Earthen Gold (Honed) with Limestone. The largest building in The Smith Center complex, Reynolds Hall, totals 232,000 square feet and seats 2,050. The building’s Grand Lobby is clad almost entirely in fine Italian marble and features custom railings detailed with a chevron pattern, a motif that is also found in the design of fixtures and furniture throughout the campus.









